Here Dave has quarter cut & wedged a old man pine heavy leaning into oak & over a shed ,he has Dave(tall tree topping) to slowly take up the weight with his digger as a 19mm swaged rope is double purchased up the tree to the digger ,this took 10min to tip this from wedging & backpulling intervals